number of troops should have some training, so that 30 of them might be available at any time when a fire occurred. Of course it would have been a voluntary scheme, but the men refused to volunteer, though the scale of payment proposed was in the opinion of the Major General sufficiently liberal.

11. The only other subject dealt with in the report of the Commission, to which I need here refer, is the construction of a Sanitarium at the Peak. It was proposed in 1883 to build on the only available site a station, which would at the same time be a Sanitarium, but General Sargent objected that the ground wanted for a redoubt. General Cameron has withdrawn the objection, on condition that the site and plan of the building should be approved by the Commanding Royal Engineer, in order that in case of need, the building might be taken over by the...

Edit History

2026-05-24 21:44:31 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
18 19 83 number of troops should have some training, so that 30 of them might be available at any time when a fire occurred. Of course it would have been a voluntary scheme, but the men refused to volunteer, though the scale of payment proposed was in the opinion of the Major General sufficiently liberal. 11. The only other subject dealt with in the report of the Commission, to which I need here refer, is the construction of a Sanitarium at the Peak. It was proposed in 1883 to build on the only available site a station, which would at the same time be a Sanitarium, but General Sargent objected that the ground wanted for a redoubt. General Cameron has withdrawn the objection, on condition that the site and plan of the building should be approved by the Commanding Royal Engineer, in order that in case of need, the building might be taken over by the...
Baseline (Original)
18 19 83 number of troops should have some training, so that 30 of them might be available at any fire occurred. Of c time when a course it would have been a voluntary. but the men voluntary scheme refused to volunteer, though the scale of payment. proposed was in the opinion of _ the Major General sufficiently- liberal. 11. The only other subject dealt with in the report of the Commission, to which I need here refer, is the construction of a Sanitarium Sanitarium at the Peak. It was - proposed in 1883 to build on the only available site a station, which would at the same time be a Sanitarium, but General Sargent was objected that the ground wanted for a redoubt. General Cameron has withdrawn the objection, on condition that the_ in site and plan of the building should be approved by the Commanding Royal Engineer, order that in case of need, the building might be taken over r by the
2026-05-24 21:44:31 · Baseline
View content

18

19

83

number of troops should have some

training, so that 30 of them might

be available at

any

fire occurred. Of

c

time when a

course it would

have been a voluntary.

but the men

voluntary scheme

refused to volunteer,

though the scale of payment.

proposed

was in the opinion of _ the Major General sufficiently-

liberal.

11.

The only other subject

dealt with in the report of the Commission, to which I need here refer, is the construction of a

Sanitarium

Sanitarium at the Peak. It was -

proposed in 1883 to build on the

only available site a station, which would at the same time be a

Sanitarium, but General Sargent

was

objected that the ground wanted for a redoubt. General Cameron has withdrawn the

objection,

on condition that the_

in

site and plan of the building should be approved by the Commanding Royal Engineer,

order that in case of need, the building might be taken over